“blank”
## checklist_for_fpc_and_deck_lead_at_end_of_survey
(end of leg 3 ask engineer for remaining fuel report (tank soundings)
All bedding and pillows stuffed in trash bags labeled USED and packed in van
All deck tables scrubbed and pressure washed
All items removed from the bridge/house including antennas, signs, wiring, etc. (leave MR350 GPS pucks mounted on vessel)
All tools cleaned and replaced in their proper case and location
Any equipment being kept in Dutch Harbor for another cruise should be inventoried and the inventory list brought back to Seattle
Baskets and white totes scrubbed or pressure washed and stacked
caps tightened
CATCH computer - Add metadata to photos and make copies of Portfolio DB and Photos from leg directory (C:) Links: Local link
CATCH computer - copy Length and Specimen App CSV files from bluetooth directory (C:) Links: Local link
CATCH computer - Make copy of DATA_ENT.MDB program in C:directory Links: Local link
CATCH computer - Run catch entry program for checking data; MAKE APPROPRIATE EDITS! Links: Local link
Checklist for bundling and stacking a net Links: Local link
Chemical storage cleaned and rinsed thoroughly and chemicals returned Links: Local link
cleaned and scrubbed
Collect all boots and rain gear loaned to interns and others as they depart the vessel
Completed Ergonomic Reporting forms sent back To Jim Malchow
Completed forms from FPC filebox
Contact shipping company to pick up loaded container(s) for southbound voyage. GBL(s) will be with Ron Payne or Kevin Godfrey. Vessel should also have digital PDF copy of GBL.
Copy of fuel receipt to RACE Directorate
CTD Computer - Make copy of CTD data files
Deck Lead or designee does line-by-line edit of catch data for each leg
Deck Lead or designee obtain electronic table of crab weights and numbers from Crab Lead and reconcile with those in DATA_ENT
Deck Lead or designee obtain electronic table of Halibut catch numbers and lengths by haul from IPHC Biologist and reconcile with those in DATA_ENT
Deck supplies cleaned
Document conditions for vessel ingress and egress
dried and packed
Electronic scales
Empty the eyewash bottles as one of your last items; ship them home empty.
ES60 Calibration (end of last leg) Links: Local link
ES60 computer - take back-up and regular hard drives back to Seattle (also take POWER SUPPLIES and USB connectors for hard drives at end of survey) Links: Local link
Ethanol and formalin buckets capped with uncut lids and buckets properly labeled Links: Local link
Freshwater rinse all metal tools and parts (bolts, washers, nuts etc.) that have been on deck and exposed to saltwater.
Frozen specimens put in freezer boxes, properly labeled and sealed with tape and shipped
GLOBE computer - Make copy of Globe log data files (C:\2020*.glg) Links: Local link
GLOBE computer - Make copy of Globe track data files (C:) Links: Local link
HAND CARRY Thumbdrive and/or hard copies back to Seattle (FPC, Deck Boss, or designee)
LAST LEG FPC: Remove GLOBE dongle, place in envelope WITH INSTALLATION SOFTWARE, hand-carry back to Seattle, and return directly to group supervisor
Leg data sheets (HAULFORM, Wheelhouse Haul Rept, DATA_ENT Catch and Length Reports (mandatory), ES60 LOG SHEETS) and hand carry to Seattle
MARPORT computer - Make copy of C:Program FilesServerdirectory (BVDR files) Links: Local link
Net mensuration gear cleaned, disassembled and packed in cases
Office and bridge computers and printers disassembled and packed in proper boxes
Office supplies packed in gray boxes
On deck Invert and Fish guides cleaned and dried
OSI 2021 Job Service No’s Links: Local link
Otolith trays
Pack only RSST items in RSST tote
Pollock otoliths packaged and shipped after each leg (EBS SHELF) Links: Local link
Preserved specimens in buckets: Take properly sealed and labeled stomach buckets to Coastal Transportation for shipment. Links: Local link
Provide Fuel PO # and sign and obtain copy of fuel receipt if fuel taken Links: Local link
RACE survival suits, PFD’s and hard hats removed from vessel and OSI storage room and placed in the 40’ container
Record the quantity of packages associated with each project and email or deliver that information to the Special Projects Coordinator
Remaining ethanol and formalin properly stored and labeled Links: Local link
rinsed with fresh water
State rooms cleaned, trash removed, and floor vacuumed (each leg!)
trays dried
trays scrubbed with dilute bleach solution
WHEELHOUSE/CALYPSO computer - Make copies of all BTD, BTH, BC2, and MARP files Links: Local link
**WHEELHOUSE/CALYPSO computer - Make copy of DDMMYYYY*.DMP and exp_python.log files from C:_data_pump_files directory** Links: Local link
WHEELHOUSE/CALYPSO computer - Use DB_Utilities to back-up WHEELHOUSE DB Links: Local link
WHEELHOUSE/CALYPSO computer - Use DB_Utilities to make 7zip file (remaining or fixed hauls) and SFTP to Seattle DB Links: Local link